Skip to content
Techno Trader
Home

Manufacturing / distribution

Virtualization consolidation with tested disaster recovery

Business applications ran on ageing physical servers of varying age, with backups that had never been restored. A hardware failure would have meant rebuilding from scratch with no confirmed recovery time.

Environment

  • Mixed-age physical servers, several past end of support
  • Backup jobs reporting success with no restore ever attempted
  • Management interfaces reachable from the general user network
  • No documented recovery point or recovery time objectives

Architecture

  • Clustered hypervisor platform sized with N+1 headroom from measured usage
  • Redundant storage paths and workload-matched performance tiers
  • Separate networks for management, migration, storage and workloads
  • Application-aware backups with an offsite and immutable copy
  • Recovery objectives agreed per service before the design was finalised

Implementation

  • Dependency mapping and measured resource profiling across a full business cycle
  • Migration in waves, starting with low-risk internal workloads
  • Physical sources kept recoverable until each wave was signed off
  • Management plane moved onto a restricted network with role-based access
  • Restore tests executed and the actual recovery time recorded per service

Outcome

  • Recovery is now a rehearsed procedure with a known, documented duration
  • Host maintenance happens without taking applications offline
  • Capacity decisions are driven by measured data rather than server specifications
  • Backup failures raise an alert to a person instead of sitting in a log

Scope the work before you commit budget

Send the environment details and get an engineered proposal with assumptions, risks and a rollback path.

Request a Quote WhatsApp